Question
Sand is being dropped from a stationary dropper at a rate of $0.5 \,\mathrm{kgs}^{-1}$ on a conveyor belt moving with a velocity of $5 \mathrm{~ms}^{-1}$. The power needed to keep the belt moving with the same velocity will be :
Sand is being dropped from a stationary dropper at a rate of $0.5 \,\mathrm{kgs}^{-1}$ on a conveyor belt moving with a velocity of $5 \mathrm{~ms}^{-1}$. The power needed to keep the belt moving with the same velocity will be :